Virsiichtsmoossname fir d'Installatioun an d'Testmaschinn vun der Haken -Typ Schossblasmaschinn ¼ˆ
- 2021-06-03-
DenHaken Typ Schoss Sprengmaschinnhuet allgemeng e gréissert Erscheinungsbild, an den Installatiounsprozess ass relativ méi komplizéiert wéi dee vu klengen Ausrüstungen. Richteg Installatioun an Testmaschinn sinn de Schlëssel fir déi normal Operatioun vun der spéiderer Ausrüstung ze garantéieren. Am Fall vun onqualifizéierten initialen Operatiounen sinn d'Benotzer verlaangt d'Instruktioune vum relevante Personal strikt ze verfollegen oder d'Instruktiounen ze verweisen. Onerlaabten Operatioun kann einfach irreversibelem Schued un derHook Shot Sprengmaschinn. Denshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. DenHaken Typ Schoss Sprengmaschinn is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Denprecautions for the installation and debugging of the relevant components are introduced below.
1. Schoss Sprëtz Apparat:
Denshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Hoist a Schraufentransporter:
Fir d'éischt en No-Load Test auszeféieren fir ze kontrolléieren ob den Heissemmer an d'Spiralblades an déi richteg Richtung lafen, da fest de Rimm vum Hoist op e moderate Spannungsgrad of fir Ofwäichung ze vermeiden, an dann e Lasttest auszeféieren fir ze kontrolléieren d'Operatioun an d'Transportkapazitéit, egal ob et komesch ass Kaméidi a Schwéngung, kontrolléiert an läscht Hindernisser.
3. Pill-Sand Separator:
Éischt préift ob d'Beweegung vum Widder flexibel ass, a préift dann déi richteg Positioun vun der Trennplack, dann wann den Hoist gelueden an debugged ass, gëtt et kontinuéierlechen Afloss vu Stolschëss, a kontrolléiert ob d'Stolschëss eraus fléien a falen wann d'Schlaang ofgeléist gëtt